The story of one project — from the day it was still an empty plot to the day the ground was ready to play on


01 — Featured project

Covered sports ground — Orawin Wittaya School

Covered Sports Field — Orawin Wittaya School

Type: Indoor sports facility / covered sports ground  ·  2025

A large steel roof structure covering the school's artificial-turf futsal pitch and multi-purpose yard, so pupils can play and gather in any weather, sun or rain. The work comprises the steel structure, metal sheet roofing and artificial turf, forming one continuous space for the school's sport and activities


02 — The build, stage by stage

Scroll to follow the story, stage by stage 0 → 100%

We recorded this project in five stages, from empty ground to handover. A single line runs down the page connecting them. Photographs of each stage are still being added; the final stage is the completed work

Stage 01

0%

Site preparation and levelling

Where everything begins — surveying the site, levelling the ground and setting out before construction starts

Stage 02

25%

Foundations and columns

Casting the footings, erecting the columns and setting the primary structure that will carry the whole steel roof in the next stage

-->

Stage 03

50%

Steel roof structure

Lifting and assembling the large steel roof structure over the pitch — the stage where the shape of the building first becomes clear

Drone footage — the steel roof stage · click to play full screen

Stage 04

75%

Roofing and pitch surface

Metal sheet roofing across the whole span and artificial turf laid — the space starts to become usable

Stage 05 · Completion

100%

Completed

The completed covered sports ground — steel structure, metal sheet roof and artificial turf forming one continuous space for the school's sport and activities in any weather

Drone footage — covered sports ground, Orawin Wittaya School · click to play full screen