Tool · Budget estimator
Set five parameters and see a budget range, cost per square metre and approximate timeline. The figures are reference values from 2026 market prices and ARKIRA's own formula; the real price comes from the drawings and the itemised BOQ in steps 2–3.
budget = area × base rate(type, grade) × f(span) × f(height) × f(size) + design / supervision feesEstimated budget range
—
Estimate ±15% · excludes land, earthworks, special piling, 7% VAT and special systems (machinery, cold rooms, swimming pools) · ARKIRA replies with a proposal within one working day and offers a free, no-obligation site visit
Assumptions and sources
| Building type | Base rate, standard grade (baht/m²) | Reference span | Source |
|---|---|---|---|
| Indoor sports hall | 12,000 – 16,000 | 30 m | ARKIRA preliminary reference — long-span steel structure, sports flooring, lighting and ventilation |
| Factory | 9,000 – 13,000 | 24 m | ARKIRA preliminary reference — warehouse shell + heavy-duty floor, building services and offices |
| Warehouse | 6,500 – 8,500 | 24 m | 2026 market price for a standard steel-frame warehouse |
| Covered sports ground | 4,500 – 6,500 | 36 m | ARKIRA preliminary reference — steel frame + metal-sheet roof, no walls |
All figures are at 2026 price levels for Bangkok and its surroundings. The real price depends on soil conditions, the site, zoning rules and the detail of building services — in step 2 we propose two or three design options with price ranges from real costs, and in step 3 you receive an itemised BOQ. The price you see on day one is the price you pay on the last day.